The failure of self-adhesive polymer modified bitumen waterproof membrane to bond with concrete substrates is a common quality problem in waterproofing projects. Its root causes involve multiple aspects, including material properties, substrate condition, construction techniques, and environmental factors. The following analysis examines the causes of this failure from multiple perspectives.

Improper substrate preparation is a direct cause of bonding failure. Uneven concrete substrates, dust, oil stains, or incompletely cured cement slurry significantly weaken the contact area and adhesion between the waterproof membrane and the substrate. For example, residual release agents or curing agents on the substrate surface, if not thoroughly cleaned, can form a separating layer, hindering the chemical adsorption of the asphalt adhesive to the concrete. Insufficient substrate strength or the presence of a loose layer can easily lead to peeling under stress. Furthermore, improper substrate moisture control is also a key factor—if the substrate moisture content is too high, water evaporation within the adhesive layer will form bubbles, leading to delamination; if the substrate is too dry, it will excessively absorb moisture from the asphalt, causing the adhesive to cure prematurely and reducing bonding strength.

Material performance mismatch or aging is an intrinsic contributing factor. The bonding performance of self-adhesive polymer modified bitumen waterproof membranes depends on the compatibility between the asphalt and the polymer, as well as the formulation design. If the softening oil content in the asphalt is too high, although it can improve initial tack, long-term storage migration of the softening oil will lead to a decrease in the cohesive strength of the adhesive, resulting in bonding failure. If the polymer modification is insufficient, such as too low an SBS (styrene-butadiene-styrene block copolymer) content, the low-temperature elasticity and anti-aging properties of the asphalt will deteriorate, making it prone to cracking under temperature cycling or freeze-thaw cycles. Furthermore, the quality of the release liner is also a contributing factor—if the release liner has uneven silicone coating or poor heat resistance, it is difficult to remove during construction, and the residual film layer will hinder bonding.

Construction process defects are a significant contributor to bonding failure. During construction, if air is not removed between the membrane and the substrate, forming "bag-like voids," the bonding area will be reduced. If the rolling is insufficient, the adhesive cannot fully impregnate the pores of the substrate, leading to insufficient bonding strength. During vertical construction, if no fixing measures (such as nail fixing or embedding in grooves) are taken, the membrane is prone to slipping under its own weight, causing localized detachment. During low-temperature construction, if the membrane or substrate is not heated, the asphalt adhesive hardens, significantly reducing initial tack. Conversely, during high-temperature construction, the adhesive's fluidity increases, leading to uneven thickness and affecting bond stability.

The long-term impact of environmental factors on bonding performance cannot be ignored. Ultraviolet radiation accelerates asphalt aging, making the adhesive brittle and reducing adhesion to the substrate. Freeze-thaw cycles, due to moisture penetration and volume expansion, generate repeated stress on the bonding layer, leading to interfacial damage. Furthermore, chemical corrosion (such as acid rain and industrial exhaust gases) or biological erosion (such as algae growth) also weakens bonding performance, especially in humid environments where microbial metabolites may alter the interfacial pH, affecting chemical adsorption.

Design flaws or insufficient attention to detail can amplify bonding risks. For example, if complex areas such as corners and pipe roots are not rounded or reinforced, stress concentration can lead to cracking. Insufficient or unsealed overlaps in the membrane allow moisture to seep in and spread along the joints, causing interlayer debonding. Furthermore, if the construction interval between the waterproof layer and the subsequent protective layer (such as a concrete protective layer) is too long, the adhesive will be prone to aging due to prolonged exposure, reducing bonding durability.

Improper material storage and transportation can lead to hidden defects. If the waterproof membrane is stored in a high-temperature environment for a long time, the asphalt will soften, causing the membrane to stick together or deform; if it is exposed to moisture or organic solvents, the adhesive performance may deteriorate. If the membrane is not quality-checked before construction (e.g., checking whether the release liner is intact and whether the adhesive is uniform), using defective materials will directly lead to bonding failure.

The bonding failure between the self-adhesive polymer modified bitumen waterproof membrane and the concrete substrate is the result of multiple factors. To avoid this problem, strict control is needed in all aspects, including substrate treatment, material selection, construction technology, environmental control, and detailed design, to ensure a durable and stable bond between the waterproof layer and the substrate, thereby guaranteeing the long-term reliability of the waterproofing project.